Skip to content

Shopping Cart ( 0 )

Your cart is currently empty.

Assembling Your Desert Steel Planter: A Quick Start Guide

Download the PDF


Product:

Tapered Box Planter

Straight Box Planter

Contents


1 20x20x24 STRAIGHT PLANTER SIDE A - TOP LAY

2 20x20x24 STRAIGHT PLANTER SIDE B - BOTTOM LAY 

3 20x20 PLANTER LID 

4 SELF-TAPPING SCREW

5 1/4"-20 X 1", HEX BOLT 

6 1/4", FLAT WASHER

7 4 1/4"-20, HEX NUT

Step 1

1. START WITH SIDE "A"

2. INSERT TABS OF SIDE "A" INTO SLOTS OF SIDE "B"

3. INSERT SELF TAPPING SCREW TO TOP HOLE.

ENSURE THAT THE LOWER TAB

OF SIDE "B" IS UNDER SIDE "A".

(SEE DETAIL A-A)




Step 2

4. INSERT TABS OF SIDE "A" INTO SLOTS OF SECOND SIDE "B"

5. INSERT SELF TAPPING SCREW TO TOP HOLE.


ENSURE THAT THE LOWER TAB OF SIDE "B" IS UNDER SIDE "A". (SEE DETAIL A-A)

Step 3

6. INSERT TABS OF SECOND SIDE "A" INTO SLOTS OF BOTH SIDE "B"s.

7. INSERT SELF TAPPING SCREWS TO BOTH TOP HOLES.

Step 4

8. FLIP ASSEMBLY OVER ONTO SOFT SURFACE TO PREVENT SCRATCHING.

9. INSERT QTY 4 SELF TAPPING SCREWS TO BOTTOM HOLES.

10. INSERT 1/4" BOLTS PER DESIRED PLANT LOCATION FROM THE UNDER SIDE OF THE LID, THEN ADD WASHER AND NUT FOR EASE OF SUTURE PLANT INSTALL. (SEE DETAIL B-B)

Step 5


11. INSERT QTY 4 SELF TAPPING SCREWS TO LID HOLES. 

12. INSERT LID PLATE TO REST ON TOP FLANGE.



Need help and cannot find the information you need? Please email us at info@desertsteel.net or call 316-282-2244. We are here to help!

 

JT
Jordon Turberfield

Previous Article

Assembling Your Desert Steel Agave: A Quick Start Guide